AWWA WQTC50371

AWWA WQTC50371 Solving Plant Siting and Water Quality Issues With High Rate Actiflo Clarification

Conference Proceeding by American Water Works Association, 01/01/1999

Crozes, Gil;Bench, Bryant;Packard, Alan;Blake, Steve

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

In 1996, the Jordan Valley Water Conservancy District hired Carollo Engineers to study the alternative processes that would allow the District to better utilize this raw water source. The District had the following objectives as it considered various alternatives: to effectively treat the available raw water; to interface efficiently with the existing processes at Southeast Regional Water Treatment Plant to provide an effective overall treatment process; to fit into the existing site and preserve area for possible future new treatment processes (e.g., ozone contactors, additional filters for 30 MGD capacity, etc.); and, to qualify as "conventional treatment plant" for log removal credit under the Surface Water Treatment Rule. Includes tables.

Contact us