AWWA MTC69682

AWWA MTC69682 Planning, Piloting and Preliminary Design of an Integrated Membrane Surface Water Treatment Plant: City of Sugar Land's Experiences

Conference Proceeding by American Water Works Association, 11/01/2009

Kommineni, Sunil; Li, Jessie; Sun, Yue; Nicholas, Brent; Stags, SuEllen; Slovak, Trent

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This powerpoint presentation begins by providing a brief overview of the City of Sugar Land's plans to build a surface water treatment plant of9 mgd initial capacity, with 22 mgd ultimate capacity to meet the Fort Bend Subsidence District mandatedreduction of groundwater use requirement by30% by 2013, and 60% by 2025. Pilot testing goals included the following:confirm that the selected treatment train canmeet the City's water quality goals;establish key design/operating criteria to enable"right sizing" of treatment processes; and,meet TCEQ requirements for pilot testing of"innovative technologies". The benchmark treatment train is presented, along with the pilot treatment train, and the microfiltration/ultrafiltration (MF/UF) pilot testing program. Testing results are provided for the following: MF/UF testing; reverse osmosis (RO) testing; clarifier pilot testing; and, granular activated carbon (GAC) testing. Recommended next steps include the following:simulate pretreatment process upset;MF/UF testing under process upset mode;MF/UF fiber cut demonstration;pilot facility decommissioning;draft pilot test report preparation; and,complete corrosion coupon tests. Includes tables, figures.

Contact us