AWWA DSS71307

AWWA DSS71307 A WTP Finished Water Pump Station: Designing a Distribution and Water Transfer Node to Meet Current and Future Needs

Conference Proceeding by American Water Works Association, 11/01/2009

Yoshimura, Jason

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.56

$24.00

(price reduced by 56 %)

Full Description

This powerpoint presentation begins by providing a brief overview of a project at East Valley Water District near San Bernardino, California, to construct a new watertreatment plant (WTP) to treat groundwatercontaminated with perchlorate. The WTP will include new storage reservoirsand a dual pressure zone pump station that will distribute water to theLower Zone and transfer water to theIntermediate Zone.The pump station design must accommodatecurrent, intermediate, and ultimate demands. Pumping requirements are presented, along withpump station configuration,pump selections, and ahydraulic model. Includes tables, figures.

Contact us